Home Energy Services in Los Angeles, CA

MLE Construction helps Los Angeles homeowners understand and improve how their homes use energy, through energy audits and solar installation. One project manager runs each job from the first inspection to the final walkthrough. Call (800) 209-2779 to schedule a free estimate.

5.0 on Google
Installer fitting solar panels on a roof
Serving Los Angeles from our Tarzana office
CSLB License#1066995
Detailed scope of workBefore work starts on your property

Get a free estimate

Leave your number and we will call you back to schedule a visit.

Licensed general contractorCSLB #1066995BBB AccreditedOne project manager per jobFree estimatesPermits handledServing Los Angeles and the ValleyBased in Tarzana

Home Energy services

MLE Construction does energy audits and solar for homes in Los Angeles. An energy audit finds where a home loses energy, such as air leaks, insulation gaps and duct leaks. Solar panels produce electricity the home uses. Each job starts with an on-site inspection and a free estimate.

How does a project run?

It runs in five steps, from the first visit to the final walkthrough.

Installer fitting solar panels on a roof
Home Energy
  1. Step 1

    Site visit

    We inspect the home, ask how you use energy and note the condition of the roof, attic and equipment.

  2. Step 2

    Scope of work

    You receive a free estimate with the scope, materials and schedule before any work starts.

  3. Step 3

    Plans and permit

    MLE prepares the plans and handles the permit when the work needs one.

  4. Step 4

    Work on site

    One project manager runs the crew and the daily progress from start to finish.

  5. Step 5

    Final walkthrough

    We walk the finished work with you and answer your questions before the job closes.

“… with MLE construction we felt a sense of honesty and knowledge from the first meeting.”

Yosep B., Google review

Common questions about home energy

Which should come first, an energy audit or solar?

Many homeowners start with an audit, since it shows where the house loses energy before panels are planned. That order is a choice, not a rule. MLE can walk you through both at the site visit.

What happens at the first site visit?

MLE Construction inspects the home, looks at the roof, attic and equipment, and asks how you use energy. After the visit you receive a free estimate, and no work starts until you have reviewed it.

Who manages the work on my home?

One MLE project manager runs each job, from the first inspection to the final walkthrough, so you have one person to ask about schedule, materials and progress. The scope of work sets out the scope before work starts.

How long does an energy project take?

It depends on the scope, the permit and the materials. An audit has fewer steps than a solar installation. The free estimate includes a schedule for your project, so you know what to expect before work starts.

Tell us about your project

Call or send the form. We will schedule a visit and give you a detailed scope of work.

Call Now(800) 209-2779
  • CSLB License #1066995
  • BBB Accredited Business
  • Detailed scope of work before we start