Restoration
How fast does mold grow after a water leak, and what to do first
There is no exact clock, but the EPA and CDC both point to drying within 24 to 48 hours.
What to do first after a leak in a San Fernando Valley home, when to call a professional, and which license to check before one company does both jobs.
Short answer
Yes, one company can do both the cleanup and the rebuild, and MLE Construction & Remodeling in Tarzana does both for San Fernando Valley homes. Check its CSLB license, and ask for a scope of work that covers drying, removal and rebuilding.

Stop the water and fix its source, then dry what got wet as fast as you can. The EPA says water-damaged areas and items should be dried within 24 to 48 hours to prevent mold growth. If mold is already there, the EPA says to clean it up and fix the water problem, because mold will most likely come back if the water problem stays.
Stay away from wet outlets and other electrical areas, and call 911 if anyone is in danger. Photograph the damage before things are moved or thrown out, and tell your insurer about the loss.
Size and the type of water are the first things to look at. The EPA says that if the moldy area is less than about 10 square feet, in most cases you can handle the job yourself by following its guidelines. For a lot of water damage, or mold covering more than 10 square feet, it points readers to its guide on mold remediation in schools and commercial buildings, which it says also applies to other building types.
If sewage or other contaminated water caused the damage, the EPA says to call a professional with experience cleaning and fixing buildings damaged by contaminated water. If you know or suspect the heating or cooling system has mold in it, the EPA says not to run it. If you hire a contractor for mold cleanup, it advises checking that the contractor has experience with mold and checking references. If you have health concerns, talk to a health professional before you start.
Related guide: How fast does mold grow after a water leak, and what to do first
It needs a current California license for any job that requires a building permit, uses employees or is valued at $1,000 or more in labor and materials. The CSLB states that rule, and says you can verify a license online or by phone.
A rebuild often involves several trades. The CSLB says that if a job requires more than two types of work on a building, it is appropriate for a licensed general building contractor to contract for and oversee the whole project. Its example is a kitchen remodel with plumbing, electrical and carpentry under one contract, which calls for a B, General Building, contractor. That contractor may do the work or hire licensed specialty contractors.
Start by confirming that the water problem is completely fixed. The EPA says cleanup is not finished until that is done, mold removal is complete, and there is no visible mold or moldy odor. It also says to check the area again shortly after cleanup for signs of water damage or mold growth, and calls the final decision a judgment call.
Closing things up too early hides problems. The EPA says not to paint or caulk moldy surfaces, and to clean up the mold and dry the surfaces before painting. Ask the company how it checks that materials are dry before new drywall or flooring goes in.
Ask what the scope covers from the first day of drying to the last coat of paint. Get the answers in the contract, not only in a conversation.
MLE Construction handles water damage restoration and the reconstruction after damage, with one project manager on the job. It holds CSLB license #1066995 in the B, General Building, classification. The office is at 18455 Burbank Blvd, Suite 205, in Tarzana, and the work includes Valley homes such as those in Woodland Hills.
Call MLE Construction at (800) 209-2779 for a free estimate. Office hours are Monday to Thursday 9 to 4 and Friday 9 to 1.
Next step: see our water damage restoration page, browse all restoration services, or contact us for a free estimate.
Not necessarily. A licensed company that handles both the cleanup and the repairs can take the whole job. MLE Construction & Remodeling does the water damage cleanup and then rebuilds the affected walls, floors and finishes.
Yes. Water that keeps coming in undoes the drying, and the EPA says mold will most likely come back if the water problem is not fixed. Confirm the source is stopped before anything is closed up.
It depends on your policy and on what caused the water. Report the loss, document the damage with photos and ask your insurer directly what is covered. MLE gives a free estimate after an on-site inspection that you can share with your insurer.
Yes. Call (800) 209-2779 or send the form and we will schedule a visit and give you a detailed scope of work.

Restoration
There is no exact clock, but the EPA and CDC both point to drying within 24 to 48 hours.

Restoration
What a standard policy usually pays for, what it leaves out, and what to document before the cleanup starts.

Remodeling
Check the license, read the contract terms the state requires, cap the down payment and confirm who pulls the permit. Here is what to check.
Call or send the form. We will schedule a visit and give you a detailed scope of work.
Call Now(800) 209-2779Thank you.
We received your request and will be in touch to schedule a visit.