Earthquake retrofits for older Los Angeles homes: brace and bolt and soft-story
Brace and bolt strengthens older houses on raised foundations. Soft-story retrofits are a separate program for larger buildings.
Which Los Angeles buildings must be retrofitted, what a steel frame does at a garage opening, and how the engineer, the permit and the contractor fit together.
Short answer
Owners of older wood-frame buildings with two or more stories and open ground-floor parking, such as tuck-under garages, need one under the Los Angeles soft-story program, and a steel moment frame is one way an engineer can strengthen the open wall line. The engineer decides if steel frames are the right fix, and MLE Construction & Remodeling in Tarzana builds the retrofit.
Representative photoThe Los Angeles Department of Building and Safety (LADBS) says a building is affected when it meets three conditions. It has two or more stories of wood frame construction, it was built under building code standards enacted before January 1, 1978, and it has ground floor parking or other similar open floor space that causes soft, weak or open wall lines.
LADBS lists one exception: the program does not apply to residential buildings with 3 or fewer units. Its Property Owner's Guide says an owner who thinks the building is exempt can appeal within 60 days of the service date of the Order to Comply, in a written request to the Board of Building and Safety Commissioners.
LADBS defines it as a structure with a weaker first floor that is unable to carry the weight of the stories above during an earthquake. The first floor generally has large openings in the perimeter walls, such as garages, tuck-under parking or even large windows.
FEMA says multi-unit wood-frame buildings with a weak first story are a significant risk in highly seismic regions because of their high potential for collapse. In its publication FEMA P-807, it says this is due mainly to soft or weak first-story walls, often weakened by many openings such as garages or storefront windows. It names apartment buildings with tuck-under parking damaged in the 1994 Northridge earthquake as an example.
Related guide: Earthquake retrofits for older Los Angeles homes: brace and bolt and soft-story
It gives a wide opening, like a garage bay, the strength a solid wall would give. FEMA P-807 says that if retrofit walls cannot fit without blocking a garage drive aisle, a design can use single-bent steel moment frames, or a mix of steel frames and wood structural panels.
FEMA P-807 also says steel retrofit elements built to the AISC 341 requirements for Special Moment Frames are most likely to meet its performance requirement, and that Intermediate and Ordinary systems are unlikely to. The document says it does not specifically require, approve or rule out any system, so the choice belongs to the engineer who designs your building's retrofit. Our soft-story retrofit service includes steel frames or braced walls at openings, strengthening of weak ground-floor walls, and connections tying the building to its foundation.
No. A brace and bolt retrofit anchors a house to its foundation and braces the short cripple walls under the floor. A soft-story retrofit deals with a weak ground floor under living space, as in an apartment building over a garage. The City program above covers that second kind of building, and its rule excludes buildings with 3 or fewer units. Our guide to earthquake retrofits for older Los Angeles homes explains the difference in more detail.
Yes to both under the city program. LADBS says the owner must hire an engineer or architect licensed in California to evaluate the strength of the building, and that person must develop the plans for its seismic strengthening. The owner must also notify tenants in writing under the housing department's regulations.
The documents to submit to LADBS are a structural analysis and calculation package, architectural plans and structural plans. LADBS says it checks plans and calculations for compliance with the retrofit ordinance and provides guidance on obtaining the retrofit permit. After the permit is issued, construction begins and inspections are requested from LADBS.
Neither source gives a build time, because it depends on the building. The LADBS guide gives deadlines instead, counted from the date of the Order. The owner must submit proof of a previous retrofit, plans to retrofit or plans to demolish within 2 years, obtain a permit within 3.5 years, and complete construction and obtain a Certificate of Compliance within 7 years.
Your own schedule comes from the scope of work, the number of openings and the engineer's design. Your contractor should tell you which areas, such as parking, will be closed and when.
MLE Construction & Remodeling, Inc. is a licensed general contractor (CSLB #1066995) and is BBB accredited. The office is at 18455 Burbank Blvd, Suite 205, in Tarzana, and we handle soft-story retrofits in the Valley, including Sherman Oaks. The engineer designs the fix, and MLE Construction builds it.
Call MLE Construction at (800) 209-2779 for a free estimate and a clear scope of work.
Next step: see our soft-story retrofit page, browse all foundation and structural services, or contact us for a free estimate.
No. LADBS says the program does not apply to residential buildings with 3 or fewer units. It covers older wood-frame buildings with two or more stories and open ground-floor parking.
Not necessarily. FEMA P-807 says it does not specifically require, approve or rule out any system. The licensed engineer or architect who prepares your plans decides which retrofit elements fit the building.
The engineer or architect designs it. LADBS says the owner must hire one licensed in California to evaluate the building and develop the plans. MLE Construction builds the retrofit from those plans.
Yes. Call (800) 209-2779 or send the form and we will schedule a visit and give you a detailed scope of work.

Foundation
Brace and bolt strengthens older houses on raised foundations. Soft-story retrofits are a separate program for larger buildings.

Foundation
The cracks, sloping floors and sticking doors worth an inspection, and the ones that are only cosmetic.

Remodeling
Check the license, read the contract terms the state requires, cap the down payment and confirm who pulls the permit. Here is what to check.
Call or send the form. We will schedule a visit and give you a detailed scope of work.
Call Now(800) 209-2779Thank you.
We received your request and will be in touch to schedule a visit.